TR-8 Electrical Metering
1RCNY IC1
The presence and operation of individual meters or other means of monitoring individual dwelling units shall be verified by visual inspection for all dwelling units.
1RCNY IIC1
The presence and operation of individual meters or other means of monitoring individual apartments shall be verified by visual inspection for all apartments.
Details
SIGN-ON / Inspect / SIGN-OFF (package)Individual Metering in NYC Buildings
Individual electrical metering is a foundational energy accountability measure under New York City's Energy Conservation Code. By requiring that each dwelling unit or apartment have its own meter or equivalent monitoring device, the ECC ensures that occupants have direct visibility into their energy consumption — which consistently reduces usage compared to buildings where utility costs are bundled into rent.
Class 1 vs. Class 2 application:
- 1RCNY §IC1 (Class 1 — 1- and 2-family homes, townhouses): Each dwelling unit must have an individual meter or monitoring device that is present and operational at the time of the TR-8 progress inspection.
- 1RCNY §IIC1 (Class 2 — multifamily residential, 3 stories and above): Each individual apartment must be separately metered or monitored. This requirement aligns with NYC Local Law 132 (2016), which mandates sub-metering for certain large residential buildings, reinforcing the ECC's unit-level monitoring requirement.
What EZTR1 Inspects
EZTR1's certified progress inspectors verify the following during a TR-8 electrical metering inspection:
- Meter presence — individual meters are physically installed and assigned to each unit per the approved electrical drawings
- Operational status — meters are energized, reading correctly, and accessible for verification
- Monitoring alternatives — where smart meters or building energy management systems are used in lieu of individual meters, the inspector confirms the system meets the "other means of monitoring" standard per the approved energy compliance filing
All findings are documented in the TR-8 inspection report filed with the NYC Department of Buildings.
Ready to schedule your TR-8 electrical metering inspection? Contact EZTR1 to confirm compliance before your DOB sign-off.
