top of page
TR-1 Flood Zone Compliance (BC G105)

TR-1 Flood Zone Compliance (BC G105)

$1,500.00Price
109.3.2 lowest floor elevation. In areas of special flood hazzard, upon placement of the lowest floor, including the basement (for flood zone purposes), and prior to further vertical construction, the elevation report required in item 1 of Section G shall be submitted to the department.
  • Details

    SIGN-ON / Inspect / SIGN-OFF (package)
bottom of page